Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 11 results ...

Ayyub, B M and Haldar, A (1984) Project Scheduling Using Fuzzy Set Concepts. Journal of Construction Engineering and Management, 110(02), 189–204.

Collier, C A and Jacques, D E (1984) Optimum Equipment Life by Minimum Life‐Cycle Costs. Journal of Construction Engineering and Management, 110(02), 248–65.

  • Type: Journal Article
  • Keywords: Service life; Life cycles; Equipment; Costs;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1984)110:2(248)
  • Abstract:
    A minimum cost equipment replacement model based on the present worth of discounted‐cash‐flow is presented. The model uses arithmetic and geometric gradients to project the expected life cycle costs of the existing machine plus future replacements to an infinite horizon and then discounts them back to present value. Trial life spans of the existing unit, plus future replacement units, are then ranged until the combination which yields the minimum present value of total costs is determined. The general methodology is reviewed and its application illustrated with a sample problem.

Grimm, C T (1984) Facade Topography in Masonry Failure Investigation. Journal of Construction Engineering and Management, 110(02), 145–51.

Hulshizer, A J and Desai, A J (1984) Shock Vibration Effects on Freshly Placed Concrete. Journal of Construction Engineering and Management, 110(02), 266–85.

Jaafari, A (1984) Criticism of CPM for Project Planning Analysis. Journal of Construction Engineering and Management, 110(02), 222–33.

Koehn, E and Espaillat, C A (1984) Costs and Benefits of MBE Rules in Construction. Journal of Construction Engineering and Management, 110(02), 235–47.

Maloney, W F and Jones, T W (1984) Labor‐Management Cooperation: Operation MOST. Journal of Construction Engineering and Management, 110(02), 205–21.

Rogge, D F (1984) Delay Reporting Within Cost Accounting System. Journal of Construction Engineering and Management, 110(02), 289–92.

Thomas, H R, Guevara, J M and Gustenhoven, C T (1984) Improving Productivity Estimates by Work Sampling. Journal of Construction Engineering and Management, 110(02), 178–88.

Thomas, H R, Heuer, D W and Filippelli, R L (1984) Settlement of Construction Jurisdictional Disputes. Journal of Construction Engineering and Management, 110(02), 165–77.

Van Der Meulen, G J R and Money, A H (1984) The Bidding Game. Journal of Construction Engineering and Management, 110(02), 153–64.